Providers

The provider index

Neoclouds, marketplaces, inference platforms and the landlords behind them. Filter by category or search; every row is in the page source even with JavaScript off.

NeocloudBuilt to sell GPU compute at scale: bare-metal clusters, managed Slurm or Kubernetes, sometimes inference. Usually NVIDIA-centric and financed by GPU-backed debt and long compute contracts.
European and regionalNeoclouds and cloud providers headquartered in Europe, from GPU-native firms to general clouds with a GPU product.
Marketplace or aggregatorBrokers GPUs owned by many independent hosts. Owns little or no hardware.
Inference platformSells API access to run or serve models. The customer never sees a scheduler, a rack or a GPU generation.
Custom-silicon cloudSells inference or systems on its own chips instead of GPUs.
Sovereign or nationalState-backed, EuroHPC or national-champion compute meant to keep AI capacity under regional control.
Miner turned AI hostFormer bitcoin miners that now lease powered buildings to neoclouds on long terms. In practice, colocation landlords.
Developer or landlordOwns land, grid position and buildings; rents powered space to tenants who bring their own compute.

47 of 47

NameHQCategoryWhat it sellsEuropean footprint
CoreWeave US Neocloud Bare-metal GPU clusters, managed Kubernetes, inference Barcelona and Bilbao sites leased from Merlin Edged; Crawley and London
Nebius Netherlands Neocloud Full-stack AI cloud, bare metal and managed Finland (Mantsala), Iceland, UK (Ark Longcross), Spain (Getafe 18 MW)
Lambda US Neocloud On-demand and reserved GPU cloud, 1-Click Clusters None verified
Crusoe US Neocloud GPU clusters, modular data centres, own power generation Norway (hydro, 12 to 52 MW), Iceland
Together AI US Neocloud Serverless inference, fine-tuning, dedicated clusters None owned
Fluidstack US (moved from UK) Neocloud Bare-metal clusters; builds campuses for named customers UK presence reduced; withdrew from a 1 GW French project in March 2026
Voltage Park (Lightning AI) US Neocloud On-demand and reserved clusters plus the Lightning platform None confirmed
Vultr US Neocloud VMs, bare-metal GPU, managed Kubernetes Amsterdam, Frankfurt, London, Paris and others
TensorWave US Neocloud GPU cloud on AMD Instinct only None found
Firmus Australia Neocloud GPU cloud and campus development in Asia-Pacific None
Nscale UK European and regional Bare-metal GPU clusters; operator for hyperscaler contracts Loughton and Blyth (UK), Narvik and Glomfjord (Norway), Sines (Portugal), Iceland
Verda (formerly DataCrunch) Finland European and regional On-demand GPU cloud, instant multi-node clusters with InfiniBand Finland
Hyperstack (NexGen Cloud) UK European and regional Self-service GPU cloud Norway (near Oslo, 6 to 14 MW)
Northern Data / Taiga Cloud Germany European and regional GPU cloud with managed Kubernetes and Slurm; high-density colocation Sweden (Boden), Norway, London
Sesterce France European and regional Bare-metal GPU clusters Bosquel (Hauts-de-France, 1 GW campus, joint venture with SoftBank), Valence, Paris
Scaleway France European and regional VMs, GPU instances, bare metal, managed Kubernetes France, Poland, Italy and the Netherlands (operating); Sweden and Germany (upcoming)
OVHcloud France European and regional General cloud with GPU VMs and bare metal 46 data centres across 4 continents
IONOS Germany European and regional Hosting and cloud with a GPU product Germany
Gcore Luxembourg European and regional GPU cloud plus edge inference and CDN Sines-2 and Sines-3, Portugal (GPU Cloud)
Cudo Compute UK European and regional Enterprise managed AI on aggregated data centres Paris, Stockholm, Kristiansand
Civo UK European and regional Kubernetes-native cloud with a dedicated GPU cloud product line (multiple NVIDIA GPU generations, several generally available) London, Frankfurt
FlexAI France European and regional Orchestration/compute platform running on a mix of owned and partner GPU capacity (CUDA and ROCm) No specific European site named by flex.ai; operates a mix of owned and partner GPU capacity
RunPod US Marketplace or aggregator GPU pods, serverless inference, Instant Clusters, community marketplace No own European site confirmed
Vast.ai US Marketplace or aggregator Peer-to-peer GPU rental, on-demand and interruptible None
Modal US Inference platform Serverless GPU compute for inference and training Stockholm and London offices
Baseten US Inference platform Managed model serving with autoscaling Remote engineers in Germany; no dedicated Europe office
Fireworks AI US Inference platform Inference API and fine-tuning None confirmed
DigitalOcean (Paperspace) US Inference platform GPU droplets, notebooks, deployments Amsterdam, Frankfurt
Groq US Custom-silicon cloud Inference API and systems on its own LPU chips Helsinki and UK, both Equinix colocation
Cerebras US Custom-silicon cloud Wafer-scale systems and an inference cloud Mikkeli, Finland (165 MW, phased; Compute Nordic Finland partnership)
SambaNova US Custom-silicon cloud Inference cloud and on-premises systems None confirmed
Mistral Compute France Sovereign or national GPU cloud for training and inference, run by Mistral Les Ulis (Essonne), 10 MW, opening Q3 2026; leased space in Sweden with EcoDataCenter (unquantified)
Evroc Sweden Sovereign or national Sovereign cloud with planned Blackwell clusters Stockholm Arlandastad; France
Polarise Germany Sovereign or national AI data-centre colocation and full-stack hosting Munich; Bavaria 30 to 120 MW from 2027
BSC, MareNostrum 5 and AI Factory Spain Sovereign or national National supercomputing centre hosting a EuroHPC AI Factory Barcelona
Telefonica Spain Sovereign or national Edge nodes and integration; no GPU cloud of its own 17 Spanish edge nodes; rollout completed
IREN Australia Miner turned AI host GPU cloud from its own sites Spain, through the Nostrum Group (Ingenostrum) acquisition announced 7 May 2026, subject to customary closing conditions; about 490 MW of secured, grid-connected power
Core Scientific US Miner turned AI host Hosts CoreWeave's fleet None
Applied Digital US Miner turned AI host Leases AI halls None
TeraWulf US Miner turned AI host Hosts Fluidstack None
Cipher Mining US Miner turned AI host Hosts Fluidstack None
Hut 8 US Miner turned AI host AI data centres and a small GPU service None
Galaxy (Helios) US Miner turned AI host Leases its Texas campus to CoreWeave None
Merlin Edged Spain Developer or landlord Builds and leases liquid-ready halls Madrid-Getafe, Barcelona-Zona Franca and Bilbao-Arasur (Spain) in operation; Lisbon-Vila Franca de Xira (Portugal) under construction; Navalmoral de la Mata and Valdecaballeros (Extremadura, Spain) announced
Start Campus Portugal Developer or landlord Develops the Sines campus Sines: 1.2 GW total campus envelope (announced); first facility SIN01 live at 37.5 MW; SIN02 planned at 200 MW
Solaria Spain Developer or landlord Solar developer supplying power and land to data centres Puertollano, Madrid
Submer Spain Developer or landlord Immersion-cooling maker turned developer Flix, Spain: former Ercros industrial site, developed and operated by Rubix Data Centers