Providers
The provider index
Neoclouds, marketplaces, inference platforms and the landlords behind them. Filter by category or search; every row is in the page source even with JavaScript off.
NeocloudBuilt to sell GPU compute at scale: bare-metal clusters, managed Slurm or Kubernetes, sometimes inference. Usually NVIDIA-centric and financed by GPU-backed debt and long compute contracts.
European and regionalNeoclouds and cloud providers headquartered in Europe, from GPU-native firms to general clouds with a GPU product.
Marketplace or aggregatorBrokers GPUs owned by many independent hosts. Owns little or no hardware.
Inference platformSells API access to run or serve models. The customer never sees a scheduler, a rack or a GPU generation.
Custom-silicon cloudSells inference or systems on its own chips instead of GPUs.
Sovereign or nationalState-backed, EuroHPC or national-champion compute meant to keep AI capacity under regional control.
Miner turned AI hostFormer bitcoin miners that now lease powered buildings to neoclouds on long terms. In practice, colocation landlords.
Developer or landlordOwns land, grid position and buildings; rents powered space to tenants who bring their own compute.
47 of 47
| Name | HQ | Category | What it sells | European footprint |
|---|---|---|---|---|
| CoreWeave | US | Neocloud | Bare-metal GPU clusters, managed Kubernetes, inference | Barcelona and Bilbao sites leased from Merlin Edged; Crawley and London |
| Nebius | Netherlands | Neocloud | Full-stack AI cloud, bare metal and managed | Finland (Mantsala), Iceland, UK (Ark Longcross), Spain (Getafe 18 MW) |
| Lambda | US | Neocloud | On-demand and reserved GPU cloud, 1-Click Clusters | None verified |
| Crusoe | US | Neocloud | GPU clusters, modular data centres, own power generation | Norway (hydro, 12 to 52 MW), Iceland |
| Together AI | US | Neocloud | Serverless inference, fine-tuning, dedicated clusters | None owned |
| Fluidstack | US (moved from UK) | Neocloud | Bare-metal clusters; builds campuses for named customers | UK presence reduced; withdrew from a 1 GW French project in March 2026 |
| Voltage Park (Lightning AI) | US | Neocloud | On-demand and reserved clusters plus the Lightning platform | None confirmed |
| Vultr | US | Neocloud | VMs, bare-metal GPU, managed Kubernetes | Amsterdam, Frankfurt, London, Paris and others |
| TensorWave | US | Neocloud | GPU cloud on AMD Instinct only | None found |
| Firmus | Australia | Neocloud | GPU cloud and campus development in Asia-Pacific | None |
| Nscale | UK | European and regional | Bare-metal GPU clusters; operator for hyperscaler contracts | Loughton and Blyth (UK), Narvik and Glomfjord (Norway), Sines (Portugal), Iceland |
| Verda (formerly DataCrunch) | Finland | European and regional | On-demand GPU cloud, instant multi-node clusters with InfiniBand | Finland |
| Hyperstack (NexGen Cloud) | UK | European and regional | Self-service GPU cloud | Norway (near Oslo, 6 to 14 MW) |
| Northern Data / Taiga Cloud | Germany | European and regional | GPU cloud with managed Kubernetes and Slurm; high-density colocation | Sweden (Boden), Norway, London |
| Sesterce | France | European and regional | Bare-metal GPU clusters | Bosquel (Hauts-de-France, 1 GW campus, joint venture with SoftBank), Valence, Paris |
| Scaleway | France | European and regional | VMs, GPU instances, bare metal, managed Kubernetes | France, Poland, Italy and the Netherlands (operating); Sweden and Germany (upcoming) |
| OVHcloud | France | European and regional | General cloud with GPU VMs and bare metal | 46 data centres across 4 continents |
| IONOS | Germany | European and regional | Hosting and cloud with a GPU product | Germany |
| Gcore | Luxembourg | European and regional | GPU cloud plus edge inference and CDN | Sines-2 and Sines-3, Portugal (GPU Cloud) |
| Cudo Compute | UK | European and regional | Enterprise managed AI on aggregated data centres | Paris, Stockholm, Kristiansand |
| Civo | UK | European and regional | Kubernetes-native cloud with a dedicated GPU cloud product line (multiple NVIDIA GPU generations, several generally available) | London, Frankfurt |
| FlexAI | France | European and regional | Orchestration/compute platform running on a mix of owned and partner GPU capacity (CUDA and ROCm) | No specific European site named by flex.ai; operates a mix of owned and partner GPU capacity |
| RunPod | US | Marketplace or aggregator | GPU pods, serverless inference, Instant Clusters, community marketplace | No own European site confirmed |
| Vast.ai | US | Marketplace or aggregator | Peer-to-peer GPU rental, on-demand and interruptible | None |
| Modal | US | Inference platform | Serverless GPU compute for inference and training | Stockholm and London offices |
| Baseten | US | Inference platform | Managed model serving with autoscaling | Remote engineers in Germany; no dedicated Europe office |
| Fireworks AI | US | Inference platform | Inference API and fine-tuning | None confirmed |
| DigitalOcean (Paperspace) | US | Inference platform | GPU droplets, notebooks, deployments | Amsterdam, Frankfurt |
| Groq | US | Custom-silicon cloud | Inference API and systems on its own LPU chips | Helsinki and UK, both Equinix colocation |
| Cerebras | US | Custom-silicon cloud | Wafer-scale systems and an inference cloud | Mikkeli, Finland (165 MW, phased; Compute Nordic Finland partnership) |
| SambaNova | US | Custom-silicon cloud | Inference cloud and on-premises systems | None confirmed |
| Mistral Compute | France | Sovereign or national | GPU cloud for training and inference, run by Mistral | Les Ulis (Essonne), 10 MW, opening Q3 2026; leased space in Sweden with EcoDataCenter (unquantified) |
| Evroc | Sweden | Sovereign or national | Sovereign cloud with planned Blackwell clusters | Stockholm Arlandastad; France |
| Polarise | Germany | Sovereign or national | AI data-centre colocation and full-stack hosting | Munich; Bavaria 30 to 120 MW from 2027 |
| BSC, MareNostrum 5 and AI Factory | Spain | Sovereign or national | National supercomputing centre hosting a EuroHPC AI Factory | Barcelona |
| Telefonica | Spain | Sovereign or national | Edge nodes and integration; no GPU cloud of its own | 17 Spanish edge nodes; rollout completed |
| IREN | Australia | Miner turned AI host | GPU cloud from its own sites | Spain, through the Nostrum Group (Ingenostrum) acquisition announced 7 May 2026, subject to customary closing conditions; about 490 MW of secured, grid-connected power |
| Core Scientific | US | Miner turned AI host | Hosts CoreWeave's fleet | None |
| Applied Digital | US | Miner turned AI host | Leases AI halls | None |
| TeraWulf | US | Miner turned AI host | Hosts Fluidstack | None |
| Cipher Mining | US | Miner turned AI host | Hosts Fluidstack | None |
| Hut 8 | US | Miner turned AI host | AI data centres and a small GPU service | None |
| Galaxy (Helios) | US | Miner turned AI host | Leases its Texas campus to CoreWeave | None |
| Merlin Edged | Spain | Developer or landlord | Builds and leases liquid-ready halls | Madrid-Getafe, Barcelona-Zona Franca and Bilbao-Arasur (Spain) in operation; Lisbon-Vila Franca de Xira (Portugal) under construction; Navalmoral de la Mata and Valdecaballeros (Extremadura, Spain) announced |
| Start Campus | Portugal | Developer or landlord | Develops the Sines campus | Sines: 1.2 GW total campus envelope (announced); first facility SIN01 live at 37.5 MW; SIN02 planned at 200 MW |
| Solaria | Spain | Developer or landlord | Solar developer supplying power and land to data centres | Puertollano, Madrid |
| Submer | Spain | Developer or landlord | Immersion-cooling maker turned developer | Flix, Spain: former Ercros industrial site, developed and operated by Rubix Data Centers |